-
- OVM Post-tensioning System
- Nuclear Power and LNG Engineering Applications
- Assembled Connection Technology for Prefabricated Piers
- Multi-strand Stay Cable System Solutions for Cable-stayed Bridge
- Cable System Solutions for Extradosed Bridge
- Parallel Wire Stay Cable System(PWS) for Cable Stayed Bridge
- Sulotions of Carbon Fiber Reinforced Composite Materials for Post-tensioning System
- Cable System Solutions for Arch Bridge
- External Post-tensioning System Solutions
- Bridge Anti-seismic Solutions
- Expansion Joints Solution System
- Building Anti-seismic Solutions
- Structural Inspection and Reinforcement System Solutions
- Lifting, Pushing, or Rotating of Overweight Structure
- Underground Space - shield Tunneling, Foundation Pit Support Equipment and Systems Solutions
- Structural Inspection and Reinforcement System Solutions
News
-
Milestone Achievement: First Stay Cables Successfully Installed on Sejingkat Bridge in Sarawak
2025-03-06
-
The first longest stay cable of the No. 2 abutment of Senqu Bridge in Lesotho has been successfully installed.
2025-03-05
-
OVM’s 500-Ton Hydraulic Lifting System Passes Rigorous Overload Testing for Power Plant Super-Heavy Component Handling
2025-03-03
-
Embarking on a New Journey in Deep-Sea Technology | OVM XXJC450 Equipment Successfully Tested!
2025-02-06
-
OVM Powers Pingnan Grand Bridge Closure!
2025-01-27
-
Precision Engineering: OVM Completes "High-Altitude Challenge" for Shuangyumen Bridge in China
2025-01-23
-
Guangxi’s Longest Cross-Sea Bridge, Longmen Bridge, Officially Opens to Traffic
2025-01-02
-
The First Successful Application of OVM Prestressed Multi-Directional Displacement Expansion Joint in Malaysia
2024-12-17
-
Huangmaohai Cross-Sea Passage Opened to Traffic
2024-12-13
Liuzhou OVM Machinery Co., Ltd.
Tel: +86-772-3116402
Website: www.ovm.cn
E-mail: sales@ovm.cn
Address: No.1 Yanghui Road, Liuzhou, Guangxi, 545006, P.R.China.