-
- OVM Post-tensioning System
- Nuclear Power and LNG Engineering Applications
- Assembled Connection Technology for Prefabricated Piers
- Multi-strand Stay Cable System Solutions for Cable-stayed Bridge
- Cable System Solutions for Extradosed Bridge
- Parallel Wire Stay Cable System(PWS) for Cable Stayed Bridge
- Sulotions of Carbon Fiber Reinforced Composite Materials for Post-tensioning System
- Cable System Solutions for Arch Bridge
- External Post-tensioning System Solutions
- Bridge Anti-seismic Solutions
- Expansion Joints Solution System
- Building Anti-seismic Solutions
- Structural Inspection and Reinforcement System Solutions
- Lifting, Pushing, or Rotating of Overweight Structure
- Underground Space - shield Tunneling, Foundation Pit Support Equipment and Systems Solutions
- Structural Inspection and Reinforcement System Solutions
Five-hundred-meter Aperture Spherical Radio Telescope (FAST) Project of National Astronomical Observatories, China, 2016
Hong Kong-Zhuhai-Macao
Bridge, China, 2016
Yang Si Gang Bridge, China, 2016
The 3rd Ping Nan Bridge, China, 2019
Yavuz Sultan Selim Bridge, Turkey, 2016
Feng Huang Ling Bridge, China, 2022
REALIZE YOUR IDEAS,
SUPPORT YOUR SOLUTIONS.
Liuzhou OVM Machinery Co., Ltd. is affiliated to Guangxi LiuGong Group Co., Ltd., and is a state-owned large company with a focus on the prestressed industry.
Products and Services
ABOUT OVM
Liuzhou OVM Machinery Co., Ltd. is affiliated to Guangxi LiuGong Group Co., Ltd., and is a state-owned large company with a focus on the prestressed industry. After nearly sixty years of development, OVM has become a diversified and specialized company integrating research and development, technical consulting, manufacturing, monitoring and inspection, and engineering construction.
National level R&D platform
Participate and publish standards
Patents
Including overseas patents
NEWS
-
The main bridge closure of Xinglian Road Project in Changsha City has been successfully completed
2024-11-29
more
-
OVM Seismic Isolation and Vibration Damping Technology provides technical support for the Xinjiang Naba Expressway
2024-11-29
more
-
OVM officially kicks off the production of the main cable for the Cangrong Xunjiang River Bridge in Guangxi.
2024-11-29
more
-
Good News! Guangxi Wins International Award —— OVM Intelligent Height-Adjustable Bearings Contribute to the Construction of Tian'e Longtan Bridge.
2024-11-29
more
-
OVM Achieves Milestone with First Visualized Smart Monitoring Application for Continuous Pushing System
2024-11-29
more
-
The Successful Joining of the Main Span of the Huaihe River Bridge Contributes to the High-quality Growth of the Yangtze River Economic Belt
2024-11-29
more
-
The Cable Force Adjustment Work of Liujing Yujiang Grand Bridge
2024-11-29
more
-
The scholarship renewal ceremony between OVM and Harbin Institute of Technology was successfully held
2024-11-25
more
-
OVM Joins Hands with Tsinghua University to Forge a New Chapter in Academic and Talent Development
2024-11-21
more
-
2024 OVM Global Customer Festival kicked off grandly in Liuzhou, at the OVM HQ
2024-11-08
more
BRIDGE 1 TO 5 IN HULHUMALE
Country / Region:Maldives
Location:ULHUMALE
Project Profile:
The bridges 1 to 5 in Hulhumale, Republic of Maldives,within the scope of the project for the development of Hulhumale Island. Bridge 1, 2, 4 span length is 52.0 m, Bridge 3 span length is 53. 1m, Bridge span length is 27.0 m. Theconstruction technique is mainly based on the supporting of the structures on abutments with piles. Superstructure of all bridges are to be made with post-tensioned in-situ reinforced concrete.
Bintulu-Jepak Bridge
Country / Region:Malaysia
Location:Sarawak
Project Profile:
The total length of the Bintulu-Jepak Bridge project is 3586.234 meters, and the bridge span arrangement is (108.4+267.6+108.4) m.
Scope of OVM: Supply and installation of 96 stay cables, supply of post-tensioning systems, high strength PT bars, and expansion joints.
DALA Bridge
Country / Region:Myanmar
Location:Myanmar
Project Profile:
The span of the DALA Bridge is (160+370+160) m, the pylon height is 139m. Arranged with 20 pairs of stay cables, and the specifications of the cable anchors are 6-31/37/43/55/61. The total weight of the steel strand for Project is 1061.6 tons.
Scope of OVM: OVM250 stay cables and installation service.
J.P.MAGUFULI Bridge
Country / Region:Tanzania
Location:Tanzania
Project Profile:
located on the south bank of Lake Victoria, with a total length of 3.2 kilometers. When completed, the bridge will become the longest extradosed cable-stayed bridge in Africa.
Sope of OVM: Bearings, expansion joints, cable-stayed system, and installation services.
Maputo-Katembe Bridge
Country / Region:Mozambique
Location:Mozambique
Project Profile:
The bridge is designed as a single-span gravity anchorage suspension bridge with a main span of 680 meters and an elevation of 141.2 meters for the south and north towers and is the largest suspension bridge in Africa.
Scope of OVM: PT materials & equipment, cable splay saddle&cable clamp and cable tightening machine.
Padma Bridge
Country / Region: Bangladesh
Location:Bangladesh
Project Profile:
Padma bridge is located about 40 kms southwest of Dhaka. It crosses the padma river. It is a dual highway and rail bridge with a two-way four-lane highway at the upper level and a single-lane railway at the lower level. Its superstructure consists of steel truss-beams with 41 holes and a span of 150 meters.The main bridge is 6,150 meters long and 21.65 meters wide.
Scope of OVM: PT system.
Mulanur Windfarm
Country / Region:India
Location:India
Project Profile:
It consists 100 nos of 3MW WT forming total capacity 300MW for tenure of 25 years. The concrete tower heights 120m, each being reinforced by 6nos external tendons & each tendon contains 17-15.7mm PC strands.
Scope of OVM: EPC (External Prestressing Cable) system for WT Industryand technical supports & supervision services.
Karot Hydropower
Country / Region:Pakistan
Location:Pakistan
Project Profile:
The “Karot Hydropower” Project is a concrete-core rockfill gravity large dam being built in Pakistan, with a planned installed capacity of 720 MW.
Scope of OVM: LDM15B Anchor Cable system/ OVM.M15A anchorage system/Spherical Bearing/GYZ Bearing/MF240/ C60 Expansion Joint /Tensioning Equipment Pump & Jack).
Belgrade Bypass Sector
Country / Region:Serbia
Location:Serbia
Project Profile:
Belgrade Bypass is located in the southeast of Belgrade, Serbia. Section 4 was officially opened on April 29, 2021. The length of section 4 is 7.72 KM, and it is a two-lane left side expressway. Section S5 was opened in June 2022.
Scope of OVM: PT system / Equipment.
Autopista al Mar 2 Highway
Country / Region: Columbia
Location:Columbia
Project Profile:
The autopista al mar 2 project consists of six functional units, which cover a length of 254 kilometers, between the municipalities of canasgordas and necocli, in antioquia.
The works include the construction of 17.7 kilometres of single carriageway, 63 Bridges and 14 tunnels.
Scope of OVM: PT anchorage and installation services.
Tseung Kwan O – Lam Tin Tunnel
Country / Region:China
Location:Hongkong
Project Profile:
The works include construction of a marine viaduct forming the TKO Interchange at Junk Bay. The Project started on 22/Jan/2018, and opened on 11/Dec/2022 at 8am.
Scope of OVM: OVM.M15A anchorage system/Tensioning equipment ( Pump & Jack)Segmental bridge assembly equipment.
Section C714 of Tanzi Exchange Road Project
Country / Region:China
Location:Taiwan
Project Profile:
The span from the tower to the opposite abutment is 117m.The Buguan Bridge across the Hanxi River is designed as a single tower asymmetric slanted bridge with the image of the string moon, with a total length of 138 meters.
Scope of OVM: PT syste.m.
4th bridge of Abidjan
Country / Region:Côte d'Ivoire
Location:Côte d'Ivoire
Project Profile:
The bridge which extends 1.4 km above Banco Bay is part of a comprehensive project to strengthen transport infrastructure and to decongest the city of Abidjan.
Scope of OVM: PT system which is being used for the reinforcement of the bridge’s concrete structure, with total amount of 2,000 Tonnes for Internal Prestressing Tendons and 400 Tonnes for External Prestressing Tendons.
Central Business District
Country / Region:Egypt
Location:Egypt
Project Profile:
The new Central Business District (CBD) for the Egyptian capital undertaken by China State Construction Engineering Corporation (CSCEC) including 20 residential, administrative, commercial and services towers,OVM supply the PT system and supervision.
Scope of OVM: PT syste.
E60 F1 Lot
Country / Region:Georgia
Location:Georgia
Project Profile:
E60 Interstate Highway starts from Brest, France, along the Atlantic coast of France to Kyrgyzstan near the border with China. It is now the first national project of Georgia.
Scope of OVM: supplied anchors, plate supports and expansion joints.
Tuas Water Reclamation Plant (TWRP) Dtss Phase 2
Country / Region:Singapore
Location:Singapore
Project Profile:
Located in the south west corner of Singapore, the Tuas Water Reclamation Plant (TWRP) project involves the construction of a new water treatment facility as part of Singapore's Deep Tunnel Sewage System Phase 2. OVM has achieved a double breakthrough in new products and new application fields in this project, and has also laid a solid foundation for participation in Singapore's MRT projects.
Sope of OVM: PL2 protection level anchorage and ring anchorage.
North-south Commuter Railway
Country / Region:Philippines
Location:Philippines
Project Profile:
The Philippine North-south Commuter Railway (NSCR) is a 163 km rail network serving commuters between Manila, central Luzon, and Calabalsung.
Sope of OVM: PT materials, equipment, and on-site guidance services in package CP N-01.
East Coast Rail Link Project
Country / Region:Malaysia
Location:Malaysia
Project Profile:
The project total length of about 665 kilometers, the project will boost the economic development of Malaysia's east coast region and greatly improve connectivity along the route.
Sope of OVM:Anchorage,intelligent tensioning equipment,intelligent groutingequipment,elastomeric bearing,expansion joint.
Rod El Farag Cable Stayed Bridge
Country / Region:Egypt
Location:Egypt
Project Profile:
Rod El Farag bridge is the world’s widest stay cable bridge with a total width of 67.36m, and was opened to traffic on May 15th, 2019.
Sope of OVM: OVM250 stay cable system with blast and fire protection, and cable force monitoring system, supervised cable installation and stressing with OVM equipment and technology.
Aby River Bridge
Country / Region:Ethiopia
Location:Ethiopia
Project Profile:
The bridge is the longest cable-stayed bridge in Ethiopia. The Abay Bridge has a 21.5m width and the capacity to accommodate a three-lane carriage way, a bicycle path and a walkway.
Sope of OVM: PT system, extradosed stay cable system and construction.
Zuari Bridge
Country / Region:India
Location:India
Project Profile:
The whole systemic materials include appr.1300 tons of PE strand, 224 sets of anchorages, 160 sets of high performance dampers, 25,000+m HDPE Pipes, On-line cable force monitoring system, and accessories,etc.
Sope of OVM: OVM250 Stay Cable Systems.
New Chroy Changva Bridge
Country / Region:Cambodia
Location:Cambodia
Project Profile:
Span arrangement(72+120+120+120+72)m.
This is the first extra-dosed stay cable project OVM has participated in Cambodia.
Sope of OVM: PT system, bridge bearing&expansion joints, pre-stressing equipment and special equipment for cable installation.
J.P.MAGUFULI Bridge
Country / Region:Tanzania
Location:Tanzania
Project Profile:
located on the south bank of Lake Victoria, with a total length of 3.2 kilometers. When completed, the bridge will become the longest extradosed cable-stayed bridge in Africa.
Sope of OVM: Bearings, expansion joints, cable-stayed system, and installation services.
Five-hundred-meter Aperture Spherical Radio Telescope (FAST) Project of National Astronomical Observatories
Country / Region:China
Location:Guizhou
Project Profile:
Cable Pcs.: 6670 pcs
Weight: 1200MT
Upper stress: 0.4fpdk
Stress range: 500Mpa
Length tolerance: +/-2mm.
Sope of OVM: OVM contracted to supply and install cable network.
Tong Ling Highway-railway Bridge over Yangtze River
Country / Region:China
Location:Tongling
Project Profile:
Rod El Farag bridge is the world’s widest stay cable bridge with a total width of 67.36m, and was opened to traffic on May 15th, 2019.
Sope of OVM: OVM250 stay cable system with blast and fire protection, and cable force monitoring system, supervised cable installation and stressing with OVM equipment and technology.
The 3rd Ping Nan Bridge
Country / Region:China
Location:Guigang
Project Profile:
The “Third Pingnan Bridge” located in Guangxi, China was completely constructed and opened to traffic back in 2020 with total length of 1,035 meters and main span of 575 meters making it the largest Arch Bridge in the world.
Sope of OVM: Supplied and installed extruded hanger cable as well as smart monitoring system.
Feng Huang Ling Bridge
Country / Region:China
Location:Liuzhou
Project Profile:
The bridge is currently the largest steel-concrete composite girder bridge in China, the world's largest span, and the largest cross-river Wind and Rain Bridge, whose main span is 700 meters with a 46.6 meters wide deck, and the length of its main line reaches 1.6 kilometers.
Sope of OVM: Steel Box Girder Incremental launching and Construction of External Prestressing.
Ma'anshan Yangtze River Highway-Railway Bridge
Country / Region:China
Location:Ma'anshan
Project Profile:
It is the first three-tower cable-stayed bridge in the world with double main spans exceeding 1,000 meters. It is also the longest combined steel truss bridge in the world with total lenth of 3248m.
Sope of OVM: Supply and installation of OVM stay cable system.
Liuzhou OVM Machinery Co., Ltd.
Tel: +86-772-3116402
Website: www.ovm.cn
E-mail: sales@ovm.cn
Address: No.1 Yanghui Road, Liuzhou, Guangxi, 545006, P.R.China.